1/2

Phase 2 (between Turney Road and the A205)

Phase 2 of the route was installed in 2023 and includes: 

  • New 3-metre-wide two-way cycle tracks protected with traffic wands along the eastern side of Rosendale Road, between Turney Road and the A205 South Circular. Click here to see the design.

  • A new parallel zebra pedestrian and cycle crossing near the junction of Turney Road, connecting the existing cycle track delivered in phase 1. Click here to see the design.

  • The pedestrian refuge on Turney Road, outside the entrance to Rosendale Primary School, has been upgraded to a zebra crossing to make crossing easier and safer. 

  • The mini-roundabout at the junction of Turney Road and Rosendale Road has been removed and replaced with priority T-junctions. These are safer as vehicles travelling south on Rosendale Road and exiting Dalkeith Road must give way to: people using the cycle lane, people walking and wheeling and to vehicles travelling north on Rosendale Road and south on Turney Road. Click here to see the design.

  • A new parallel zebra pedestrian and cycle crossing near the junction of Lovelace Road. This will improve connectivity for residents and people walking/wheeling and cycling from Lovelace Road. Click here to see the design.

  • The pedestrian refuge on Rosendale Road, adjacent to All Saints Church, has been upgraded to a raised zebra crossing. Click here to see the design.

  • Dropped kerbs and widened footway 'build-outs' at the junction of Rosendale Road and Turney Road. 

To view the designs, click the link to the PDF at the bottom of this page. 

The decision report for installation of Phase 2 can be found here.

Check out the following documents

Phase 2 - Designs.pdf
Phase 2 - Designs.pdf
pdf

This engagement phase has finished