Home
In phase 3 of the Brockwell Park to Gipsy Hill Healthy Route, the bi-directional cycle track will be extended south along Rosendale Road from the A205 to the junction with Park Hall Road.
Phase 3 consists of:
Find out more in the decision report, which approves statutory consultation on traffic orders for Phase 3 of the Healhty Route.
Transport for London (TfL) are leading on redesign of the Rosendale/A205 junction, with input from Lambeth. Designs are still being developed and will be shared as soon as possible. Lambeth and TfL are working together to install the junction and Phase 3 of the Healthy Route at the same time.